STEAMDISTRIBUTORSASD / BSD / CSDSteam DistributionInstallation ManualIMPORTANT: Read and save this guide for futurereference. This guide to be left wi
-8-ASD & BSD1506162- Distributor End Cap AssemblyCSD1506164 - Distributor End Cap AssemblyDistributor CoreExploded ViewsDecember 18, 2002ASD &
LIMITED WARRANTYWalter Meier Inc. and/or Walter Meier Ltd. (hereinafter collectively referred to asTHE COMPANY), warrant for a period of one year from
Walter Meier (Climate USA) Inc.826 Proctor Avenue, Ogdensburg, New York 13669Walter Meier (Climate Canada) Ltd.2740 Fenton Road, Ottawa, Ontario K1T3T
Table Of ContentsINSTALLATION ...1RECEIVING & UNPACKING EQUIPMENT ...1PRE-INSTALLATION...
INSTALLATIONRECEIVING & UNPACKING EQUIPMENT1. Check packing slip to ensure ALL materialhas been delivered.2. All material shortages are to be repo
Chart #3Recommended Condensate line at distributor(s)CONDENSATE RETURN GUIDELINES FORMAIN STEAM LINES1. Use vertical condensate leg of distributoronly
-3-NHB, NHP, NHMC,RESDELUX ONLYTo be 2” (50mm) longerthen duct static pressureor minimum.To be 2” (50mm) longerthen duct static pressureor minimum.6”m
-4--45ºGO TO123C2+45º1xBAlways align distributor holes so that steam is dischargedupwards to ensure condensate will remain in the distributor.Figure #
-5-C1DGO TO¿3.6 mm81-...81-...61-...41-...43mm61mm61-... / 41-...¿3.6mm81-...61-.../41-...HXXMin. HMin.ASD3” (76mm)BSDCSDASD ø 1.7" (43 mm)BSD ø
-6-C2DGO TOAlways align distributor holes so that steam is dischargedupwards to ensure condensate will remain in the distributor.H1/3W2/3WW1/3W1/3W1/3
-7-#10 Sc rewUse self tapping screws.GO TOEDFigure #6Distributor Mounting - Horizontal & Vertical FlowE5/16”5/16” uncSupport Bracketby OthersManda